Infrastruktur-Störung 5210 Windisch Start:11/24/2023 12:35 PM Assumed duration of disturbance:11/24/2023 6:20 PM
This service is affected:
Service | Impact Description |
---|
BBCS | INC |
Description/ current status: The fault has been rectified. The systems/services are working normally again. Location: 5210 Windisch Technical details: Network element type: DSLAM-micro CAN (micro Copper Access Node); designation: ipd-wn5l790-s-bh-01 ipd-wb1v790-s-bh-01 ipd-wh2u790-s-bh-02 ipd-wh2u790-s-bh-01 ipd-wi8o790-s-bh-01 ipd-wh2y790-s-bh-01 ipd-wi8r790-s-bh-01 ipd-wi8w790-s-bh-01 ipd-wi8p790-s-bh-01 ipd-wi8s790-s-bh-01 ipd-wh2j790-s-bh-01 ipd-wb1v790-s-bh-02 ipd-wifm790-s-fa-02 ipd-wdus790-s-fa-03 nu-mob-ch-habu-r-001 au-mob-ch-wikf-r-001 nu-mob-ch-brks-r-001 ipd-wimu790-s-ch-01 Measures: No further measures are planned. |