Wholesale Incident Information
Swisscom

Infrastruktur-Störung Avers

Start:11/25/2023 9:36 PM
Assumed duration of disturbance:11/25/2023 10:00 AM

This service is affected:

ServiceImpact Description
BBCSINC

Description/ current status:
Disturbance of the external power supply.

Location:

Technical details:
Network element type: DSLAM-micro CAN (micro Copper Access Node); designation: ipd-cz7b660-s-ph-01 ipd-cz7e660-s-ph-02 ipd-cz7d660-s-ph-01 ipd-cz7c660-s-ph-01 ipd-cz7f660-s-ph-01 ipd-cz7e660-s-ph-01 ipd-cz7g660-s-ph-01

Measures:
The rectification has been initiated. The supplier is cooperating in troubleshooting. The shutdown of the RPU has been initiated to maintain the operation of the 66CRO control center.